Panel H-1
REQ25 loads have no load category.
Warning: feeder circuit load not counted. Open H-1 below for details.
Fictional 2,600 sf all-electric residence with a detached garage, heat pump, induction cooking and EV charging. Demonstration data only; no real client, person or address is represented.
NEC 2020 Article 220 calculated loads for non-dwelling occupancies, from the linked feeder tree each time the page loads.
25 loads have no load category, so the panels that carry them read REQ: loads without a load category are not calculated. Dwelling-unit calculations are not available yet. Choose each load's category in its panel's editor.
25 loads have no load category.
Warning: feeder circuit load not counted. Open H-1 below for details.
| Equipment | Connected VA | Calculated VA | Max load A | Continuous A | Heaviest line A | Supply | State |
|---|---|---|---|---|---|---|---|
| 25 loads have no load category. Warning: feeder circuit load not counted. | -- | REQ | -- | -- | -- | -- | REQ |
Blocking (25)
Warnings (1)
| |||||||
| 8 loads have no load category. | -- | REQ | -- | -- | -- | -- | REQ |
Blocking (8)
| |||||||