Forewit
Shared public demo. Use fictional data. Anyone can change these projects.Join the waitlistContact
MP-D1 (EQUIPMENT ROOM)
MP-D1
MAIN:M.C.B.RATING:125 ASPACES:30SERVICE: 120/208 V, 3-PHASE, 4-WIREMOUNTING: SURFACEFEEDS FROM: BUILDING DISTRIBUTION / 125 A FEEDERPANEL SCCR: 22 KATRIM: HINGED DOOR, NEMA 1A.I.C.: 22 KAFAULT CURRENT CALCULATED 2026-11-22 / fnv1a32:12fde621AFC: 9.5 KA, uses Eaton Table 4 C values not yet checked against the bookA.I.C. PASS, SCCR PASS
Panel schedule for MP-D1, odd circuits on the left and even circuits on the right
CKTDESCRIPTIONKVACIRCUIT BREAKERBRANCH CIRCUITCVD%PHCKTDESCRIPTIONKVACIRCUIT BREAKERBRANCH CIRCUITCVD%PH
POLETRIPPNGNDPOLETRIPPNGND
15.433010--10--0.60A24.533010--10--0.72A
310----B410----B
510----C610----C
73.623010--10--1.66A83.623010--10--1.80A
910----B1010----B
112.422012--12--2.16C129.03408--10--0.94C
1312----A148----A
15----------------B168----B
174.522510--10--0.87C181.08120121212--0.80C
1910----A20----------------A
21----------------B22----------------B
23--120----------C24--120----------C
25----------------A26----------------A
27----------------B28----------------B
29----------------C30----------------C
CONNECTED LOAD: 34.08 KVAPHASE A: 111.3 APHASE B: 82.5 APHASE C: 90.3 AIMBALANCE: 30.4%
WORST COMBINED VOLTAGE DROP: 3.13% AT CKT 11,13, C405.5.3, uses Table 9 values not yet checked against the book
CALCULATED LOAD: 36.35 KVA (37.47 KVA CONTINUOUS AT 125%)MAXIMUM LOAD: 117.46 A, 94% OF 125 A MAIN, HEAVIEST LINE ACONTINUOUS AT 125%: 122.16 A, 98% OF 125 A MAIN, HEAVIEST LINE A
RECEPTACLESCOUNTED 1.08 KVADEMAND 1.08 KVATable 220.44: first 10 kVA at 100 %, the rest at 50 %
MOTORCOUNTED 18.91 KVADEMAND 21.17 KVA220.50 and 430.24: every motor plus 25 % of the largest
OTHER (NAMEPLATE)COUNTED 14.10 KVADEMAND 14.10 KVA220.14(A): nameplate at 100 %
Unreviewed data: the calculated load uses NEC 2020 values not yet checked against the book: 220.14(I) (single or multiple receptacle on one yoke); Table 220.44 (first band limit, first band factor, remainder factor).
NOTES: Synthetic demonstration schedule. Connected loads, run lengths, raceways, installed conductor sizes, load categories, served areas, equipment ratings, energy code scope and fault-current inputs are fictional. Table values are not yet checked against the book.
Unreviewed data: 1 C value from Eaton's Short-Circuit Current Calculations (2014), Table 4, three single conductors at 600 V, used on the run to MP-D1, not yet checked against the bulletin: copper in steel conduit: 1 AWG. get_fault_current lists each value and where it is used.

Calculated load

Calculated

36.35 kVA37.47 kVA with continuous loads at 125 %

Maximum load
117.46 A 94 % of the 125 A mainheaviest line A
Continuous at 125 %
122.16 A 98 % of the 125 A mainheaviest line A

At 208 V, three-phase.

Calculated load by category
CategoryCountedDemandRule
Receptacles1.08 kVA1.08 kVATable 220.44: first 10 kVA at 100 %, the rest at 50 %
Motor18.91 kVA21.17 kVA220.50 and 430.24: every motor plus 25 % of the largest
Other (nameplate)14.10 kVA14.10 kVA220.14(A): nameplate at 100 %
  • Unreviewed data: 4 table values (220.14(I), Table 220.44) not yet checked against the code book.

Discard changes?

The panel reverts to its last save.

Discard circuit edits?

Unapplied changes to this circuit will be lost.

Leave without saving?

Unsaved changes will be lost.